Bim-Integrated Project Planning and Scheduling Using Primavera

Uncategorized

Authors: Eedara Venkata Hareesh, N.Sriaknth

Abstract: Building Information Modeling (BIM) has emerged as a transformative digital technology in the construction industry by enabling intelligent 3D modeling, improved collaboration, and efficient information management throughout the project lifecycle. However, successful project execution not only depends on accurate design representation but also requires effective project planning, scheduling, and resource control. Primavera P6 is widely recognized as a powerful project management software that supports detailed planning, time scheduling, cost estimation, and progress monitoring for complex construction projects. The integration of BIM with Primavera provides a highly efficient platform for developing realistic construction schedules, improving project visualization, and ensuring better decision-making during project execution.This study focuses on BIM-integrated project planning and scheduling using Primavera to enhance the effectiveness of construction project management. BIM models developed using software such as Revit are linked with Primavera schedules to establish a strong relationship between project activities and building components. This integration supports 4D planning, where the time dimension is combined with the 3D model to simulate construction sequencing and visualize the progress of project execution. Through BIM-based scheduling, construction stakeholders can identify logical activity sequences, detect clashes in time and space, and optimize the use of labor, materials, and equipment. The integrated approach improves coordination between architects, engineers, contractors, and project managers, thereby minimizing scheduling conflicts, reducing rework, and improving productivity.

 

 

× How can I help you?